Load the railbus shift file, get draft duties from Able AI™, and put the route on your drivers’ tablets. For operators running Queensland Rail track closures.
The closure is Queensland Rail’s. The operation is yours.
From the shift file to the drivers in the seats and the report at the end.
Able AI reads the railbus shift file, matches every trip to the government’s railbus timetable and drafts the duties. Nothing is created until you confirm it, and a fatigue check runs across every duty.
Put a driver and a bus on every railbus duty on the roster board, with any gaps flagged before the roster is published, and reshuffle on the day when a driver calls in sick.
The duty in order, the pre-departure check and turn-by-turn directions along the railbus route on the tablet, with on-time status at every stop.
Every railbus on the live map against its trip, on-time running by route, day, stop and driver, and the Shift Trip Matrix with kilometres and hours for every shift.
See it end to end: our QLD railbus guide follows a 46-page shift file through Able AI to 26 draft duties, checked against the fatigue limits, and on to turn-by-turn navigation in Driverable.


The modules a Queensland closure actually touches.
A railbus is a timetabled bus service that replaces trains during a Queensland Rail track closure. A closure usually runs both express and all-stops railbuses along the affected corridor.
The Department of Transport and Main Roads arranges replacement capacity, Queensland Rail schedules and publishes the track closures, and Translink is the customer-facing journey planner and app.
Queensland Rail publishes planned closures on a rolling twelve-month calendar, though additional works can be scheduled and closures can be extended at short notice.
The PDF of driver shifts for a Queensland track closure: sign-on times, the trips each shift runs, standby shifts, effective dates and the dead runs out of and back into the depot. Able AI reads it and drafts the duties for the operator to confirm.
They are imported directly from the Queensland Government’s data feeds. Every South East Queensland railbus route and timetable comes into Busable with its route shape, stops and times.
Through Driverable on the tablet in the cab. It has their duty in order and turn-by-turn directions along the railbus route, planned for a heavy vehicle, and shows whether they are on time at every stop.
Yes. Able AI drafts the duties from the shift file, the roster board puts a driver and a bus on each, Driverable guides the driver along the railbus route, and the depot tracks every railbus with on-time running and the Shift Trip Matrix.
The Queensland term for a timetabled bus service replacing trains during a track closure, run as express or all-stops along the corridor.
Closing a section of rail line to passenger trains so engineering or project work can be done. The rough equivalent of a NSW possession.
The PDF of driver shifts for a track closure: sign-on times, the trips each shift runs, standby shifts, effective dates and the dead runs out of and back into the depot.
The Queensland Department of Transport and Main Roads, which arranges rail replacement capacity and owns the dedicated replacement bus fleet.
The Queensland Government public transport brand, and the journey planner, app and service-notice channel passengers use.
The operator of the South East Queensland train network, which schedules and publishes the track closures.
Bring us the plan you were handed and we will walk you through it.
Or read how QLD railbus shift files become driver navigation and see rail replacement across all states.
Talk to us about a shutdown