Rail replacement software for
CBC panel operators
Build a rail possession, produce the TODIS file for Transport for NSW, and roster the drivers to run it. For operators on the TfNSW Contingent Bussing Contract panel.

The possession is planned. The paperwork never is.
Trackwork is scheduled months out. The work reaching your depot is not. Shifts get handed back by another operator, corridors get extended, and a stop moves street two days before the possession — each time, the TODIS file has to be rebuilt and resubmitted inside the window.
Drawing route paths and typing timetables by hand does not fit that window. When the file misses the cut-off the buses still run, but they run invisibly — no journey planning, no live tracking, no in-cab navigation. Passengers fall back on printed notices.
What Busable does for a possession
From the bussing request to the submitted file to the drivers in the seats.
TODIS file production
Driver duties and allocation
Costing and reporting
Drivers on the road
What it looks like
The screens a possession runs through, from the published timetable to the payment claim.




Integrated Products for Rail Replacement
The modules a possession runs through, from the bussing request to the payment claim.
Planable™ – Possession route and timetable
Able AI – The possession build
Rosterable™ – Duties and allocation
Driverable™ – The driver in the bus
Reportable™ – Costing and the record
Got a possession coming up?
We work with Contingent Bussing Contract operators on possession scheduling and TODIS submission to Transport for NSW. Bring us your next bussing request and we will walk you through it.
New to this? Read our guide to TfNSW rail replacement, the CBC and the TODIS file.